Grid Transition Levy Rs 791/MMBtu & break-up

19 April 2025

Author: Asif S Kasbati (FCA, FCMA & LLB)

From: Asif Siddiq Kasbati <asif.s.kasbati@professional-excellence.com>
Date: Mon, Mar 17, 2025 at 2:11 PM
Subject: PGEC162= Grid Transition Levy Rs 791/MMBtu & break-up
 
POL, Gas & Electricity Quick Commentary - PGEC 162

 

Further to KQU 3288 dated 14.3.25, being an Important matter, we would inform you about GOP, Ministry of Energy (Petroleum Division) Notification of 7.3.25 A levy of PKR 791 has been calculated and will be applied over and above PKR 3,500. making a total of Rs 4291 per MMBTU (Attachment 162.1) in the ensuing paragraph, with emphasis in bold & Underline for quick reading.

 

2.   As per SRO without number dated 7.3.25, in exercise of the powers conferred by sub-section (1) of section 3 of the Off the Grid (Captive Power Plants) Levy Ordinance, 2025 (I of 2025), the Federal Government is pleased to notify that the rate for the purpose of sub-section (1) of the said section 3 shall be Rs 791 in per Million British Thermal Units (MMBtu).

 

3.   Rs. 791/MMBtu Grid Transition Levy Calculation

 

 

Unites

Value

Captives Plants

Thermal Efficiency

36%

Sale price for Captives

PKR/MMBTU

3,500

Gas Cost at Sale Price

PKR/kWh

33.17

O&M / Fixed Cost

PKR/kWh

1.65

Total Energy Cost

PKR/kWh

34.82

Grid B3 Peak (B3 Jan-25)

PKR/kWh

40.3

   

Levy Calculations

   

Margin

Grid B3 Peak x 5%

2.015

Increase Req. to remove Grid Disparity & Margin

PKR/kWh

7.49

Revised Gas Price to remove Grid Disparity & Margin

PKR/MMBtu

4,291

Levy Required

PKR/MMBtu

791

 

4.   Notes to the calculation

 

1.   Gas Sale price for Captives determined by OGRA

2.   O&M/Fixed cost determined by NEPRA

3.   Net Efficiency of Captives conveyed by Industry

4.   Current Grid price for B-3 industrial consume PKR (Peak) as determined by NEPRA, exc. Taxes.

5.   Fixed Cost for Gas Based CPP determined by NEPRA @ 37.5% efficiency

6.   The levy rate will be adjusted based on the revised FCA by the end of the week

 